Day 1: Tiling

matthew's picture

So it turns out that tiling a floor is a 3 or 4-day job. The work isn't long during the "work" time, but you have to wait for stuff to dry before you do the next step, so at a minimum it's 3 days, and 4 if you want to be careful.

The first step is the underlayment -- called "backer board" -- whatever sort you are using. You spread thin-set (another name for concrete) on the floor, then lay your underlayment, let it dry, then start laying tile on top of it.


I'm not entirely sure I should have taken on this project, but I'm doing it anyway.


Demolition begins. Yeah, that black stuff is the reason we're doing this. It hadn't destroyed the sub-floor, but had swelled it some.


Floor's ripped out, thinset is mixed, making a mess, I'm cheerful.


That goop is the thin-set, with a 1/4x1/4 trowel atop it. I ended up wishing Home Despot hadn't been sold out of margin trowels by the time I was done. And that orange stuff is a plastic type of backer-board that I'm trying out. It's very light and convenient.

AttachmentSize
Tiling 012.jpg26.12 KB
Tiling 007.jpg35.2 KB
Tiling 003.jpg133.91 KB
Tiling 004.jpg43.85 KB

Comments

Comment viewing options

Select your preferred way to display the comments and click "Save settings" to activate your changes.

Tiling

DITRAMAT!!!! I was actually clicking on this when I saw you mention backer board to post what Ditramat is and how WONDERFUL the stuff is! Tiled the entire great room of my old house 2 years before we sold it, and never regretted it!

So much lighter then backer board, thinner then backer board, and you can begin setting tile on it IMMEDIATELY!

Chris